Fabrication of 28m Steel Working Barge

Fabrication of 28m Steel Working Barge

Our company was entrusted with the design and building of Ta’ Mattew II barge which was designed for a local fishing company. The steel barge has been built in a period of six months to the clients requirements. 

 

Overall length -28m

Beam – 7m

Net tonnage-  115 tones

Material – Steel

Having two  Hydraulic cranes

Accommodation for 8 Persons

Gallery: